S.NName of The ProjectName of ClientStatus
1.0Upper Madi-0 Hydropower project(38 MW)Annapurna Power Company Pvt.LtdOngoing
2.0Thulo Khola Hydropower Project-21.3 MW, MyagdiSungabha Hydropower Company Pvt. LtdOngoing
3.0Sagu Khola Hydroelectric Project -20 Mw, DolakhaHimparbat Hydropower Pvt. Ltd.Ongoing
4.0Irkhuwa khola B Small hydropower project -15.52 Mw, BhojpurBaraha Multipower Pvt. LtdOngoing
5.0Upper Seti-1 Hydropower project –13 Mw, KaskiShrestha Energy Solution Pvt. LtdOngoing
6.0Sabha Khola –A Hydropower Project 10.4 Mw, SakhuwasabhaaDipsabha Hydropower Pvt. Ltd  Koteshwor -35, KTMCompleted
7.0Garchayang Khola Hydropower Project (6.6 MW),KaskiCitizen Hydropower  Company Pvt. Ltd Dhobighat LalitpurCompleted 
8.0Super Chepe Khola Hydropower Project (9.05 Mw)Ridge Line Energy Pvt.Ltd            completed
9.0Bhim Khola Small Hydropower Project-4.96 MW, BaglungShikhar Power Company Pvt. LtdCompleted
10.0Lankhuwa Khola Small Hydroelectric Project 5.0 MWSabhapokhari Hydropower   P. (Ltd)Completed
S.NName of The ProjectName of ClientStatus
1.0Sano Bheri-3 Hydropower Project 42 MW ,RukhuCountry Development Company Pvt. Ltd , Balaju Industrial Area, KathmanduCompleted
2.0Super Chepe Khola Hydropower Project (9.05 Mw)Ridge Line Energy Pvt.Ltd            Completed
3.0Upper Mudi Khola Hydropower Project(12.7 Mw)Fresh Water Energy LtdCompleted
4.0Upper Daraudi-B Small Hydropower Project 8.0 MW ,GorkhaKalika Construction (Pvt) Ltd Kalika Tower, Baluwatar,KTMCompleted
5.0Upper Seti-1 Hydropower project –13 MW, KaskiShrestha Energy Solution Pvt.LtdCompleted
6.0Thulo Khola Hydropower Project-21.3 MW, MyagdiSungabha Hydropower Company Pvt. LtdCompleted
7.0Bhim Khola Small Hydropower Project-4.96 MW, BaglungShikhar Power Company Pvt. LtdCompleted
8.0Kintang Khola Hydropower Project -4.0 MW, DhadingVision hydro pvt.ltd KathmanduCompleted
9.0Super Mai-A Hydropower Project-9.6 MW, IlamSagarmatha Hydropower Company Pvt. LtdCompleted 
10.0Galkot Daram Khola Hydroelectric Project -5.0 MW,BaglungGalkot Daram  Khola Hydropower Pvt. Ltd.Completed

S.N

Name of The Project

Type of Work

Name of Client

Status

1.0

Due –Diligence Study Report of Nilgiri  Khola II cascade Hydropower Power Project 62.0MW, Myagdi

Review of survey report, Hydrology, Geology ,Detail Design  ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal Prime Commercial  Bank And Its Consortium)

Nilgiri khola Hydropower Power Company Ltd, Kamaladi

completed

2.0

Due –Diligence Study Report of Nilgiri -1  Hydropower Power Project 38.0MW, Myagdi

Review of survey report, Hydrology, Geology ,Detail Design  ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal Prime Commercial  Bank And Its Consortium)

Nilgiri khola Hydropower Power Company Ltd, Kamaladi

completed

3.0

Due –Diligence Study Report of Balephi-A Hydropower Project 10.6 MW, Sindhupalchok

Review of Survey report, Hydrology, Geology ,Detail Design  ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal  Bangladesh Bank And Its Consortium)

Moonlight Hydropower Project Pvt. Ltd, Bijulibazar

Completed

4.0

Technical  –Diligence Study Report of Tadi khola Small  Hydropower Power Project 5.0MW, Nawakot

Review of survey report, Hydrology, Geology ,Detail Design  ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal Investment  Bank And Its Consortium)

Hiraratna  Hydropower Power Pvt.Ltd, Shamakhushi

Completed

5.0

Due –Diligence Study 

Lower Midim Khola Hydropower Project-1.0 MW Lamjung

Review of Survey report, Hydrology, Geology ,Detail Design  ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Machhapuchhre Bank Limited)

Lower Midim Khola Hydropower Company Pvt.Ltd, Kathmandu

Completed

6.0

Supplementary Due –Diligence Study Report of

Bagmati Small Hydropower project- (Capacity Upgrading from 20MW to 22 MW) , Lalitpur

Review of  Hydrology, Geology ,Detail Design  ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal Prime Commercial  Bank And Its Consortium)

Mandu Hydropower Company Pvt.Ltd, Kamladi, Kathmandu

Completed

7.0

Supplementary Due –Diligence Study Report of Lower Modi Khola Hydroelectric Project (20 MW), Parbat

Consultancy services for

Assessment of cost overrun of Lower Modi Khola Hydroelectric Project (20 MW) on behalf of (Nepal investment Bank and its Consortium)

Modi Energy (P.) Ltd.

Completed

8.0

Supplementary Due –Diligence Study Report of Madkyu Khola Hydropower Project 13MW, Kaski

Review of Survey report, Hydrology, Geology ,Detail Design  ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal  Bank Limited And Its Consortium)

Sikles Hydropower Pvt. Ltd, Pokhara

Completed

9.0

Supplementary Due –Diligence Study Report of Chake khola  Hydropower Project 3MW, Ramechhap

Review of Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal  Bank Limited And Its Consortium)

Garjhang Hydropower Pvt. Ltd, Bijulibazar

Completed

10.0

Bagmati Small Hydropower project- 22 Mw, Lalitpur

Bill verification of Civil , E/M, H/M and Transmission line works  On Behalf Of (Prime Commercial Bank Limited and its consortium)

Mandu Hydropower Company Pvt.Ltd, Kamladi, Kathmandu

Completed

11.0

Upper Hewa Khola Hydropower Project -8.5 MW, Sankhuwasabha

Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation  On Behalf Of (NMB Bank Limited and its consortium))

Upper Hewa Khola hydropower company Pvt. Ltd.

Ongoing

12

Suri Khola Hydroelectric Project (7.0MW), Dolakha

Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation  On Behalf Of (Prabhu Bank Limited)

Suri  Khola Hydropower Ltd

Ongoing

13

Kalanga Gad Hydroelectric Project” (15.33 MW), Bajhang

Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation  On Behalf Of (NMB Bank Limited)

Kalanga Hydro P. Ltd. (KHPL)

Ongoing

14.0

Chauri Khola Hydropower Project (6 MW)

Bill verification of Civil , E/M, H/M and Transmission line works On Behalf Of (Machhapuchhre Bank Limited and its consortim)

Chauri Hydropower Company (P) .Ltd, Anamnagar-32, Kathmandu

On going

15.0

Jeuli Gad Small Hydropower Project-966.0 KW, Doti

Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation  On Behalf Of (Machhapuchhre Bank Limited)

Rangun Khola Hydropower  Pvt.Ltd, Kathmandu

On going

16.0

Upper Khorunga khola Small Hydropower Project (7.5 MW)

Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation  On Behalf Of (Machhapuchhre Bank Limited)

Terhathum Power Company ( P) Ltd.

On going

S.N

Name of The Project

Type of Work

Name of Client

Status

1.0

Hydrological Study of the Bhotekoshi River

Inception, Field Draft, and Final Report of Hydrological Study of Bhotekoshi River

Department of Water Induced Disaster Prevention, Pulchowk

Completed

2.0

Mapping Of Micro Hydropower(MMHP And Preparation Of District Electrification Master Plan (DEMP)

Mapping of Micro hydropower project

AEPC, Khumaltar

Completed

3.0

Chitwan national park Building

Structural design, Drawing and preparation of report

Chitwan national Park Kasar, Chitwant

Completed

4.0

School of Science & Technology Building, Mid-Western University Surkhet 

Structural Reports & Construction Recommendation for the Building

Mid-Western University, Surkhet

Completed

5.0

Bajura Water Supply & Sanitation Project

Feasibility Study, Detail Survey & Design (2 Projects)

WSSSDO-Bajura, Martadi

Completed

6.0

Rakam Irrigation Project, Surkhet

Feasibility Study, Detail Survey & Design

Mid-Western Irrigation Development Division-3, Surkhet

Completed

7.0

Seti River Training Works, Seti River, Doti

Desk Study, Hydrological Study, Section Details, Detail Design and Report Preparation of Seti River 


Water Induced Disaster Prevention S.D. No.-5, Doti

Completed

8.0

Bajura Water Supply & Sanitation Project

Feasibility Study, Detail Survey & Design (2 Projects)

WSSSDO-Bajura, Martadi

Completed

9.0

Design of Elevated Water Tank at Butwal Municpality, Butwal

Final Report on Structural Design, Drawings, Estimate and BOQ of Elevated Water Tank

LUMANTI Support Group for Shelter, Tahachal, Kathmandu

Completed

10.0

Jalad River Control Works, Dhanusha

Final Report of Assessment of human dimension of People’s Embankment Programme in a Community

DWIDP, Pulchowk, Lalitpur

Completed 

11.0

River Training Works of Seti River from Girihauka to Tikhatar

Preparation of Master Plan

Water Induced Disaster Prevention Sub-Division, Doti

Completed

12.0

Trisuli Trial Bridge, Trisuli Khola, Nuwakot:

Type : D

Span : 216.0 m

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study, Detail Design, Drawing, Rate Analysis, Cost Estimate and BOQ



MoFALD, DoLIDAR, Suspension Bridge Division

Completed

13.0

Sindure Trial Bridge, Sindure, Nuwakot

Type : N

Span : 227.8 m

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study, Detail Design, Drawing, Rate Analysis, Cost Estimate and BOQ



MoFALD, DoLIDAR, Suspension Bridge Division

Completed

14.0

Punyamati Khola RCC Bridge, Banepa Municipality, Kavreplanchok District

Span : 45m

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study, Detail Design, Drawings, Rate Analysis, Cost Estimate and BOQ

Banepa Municipality, Banepa, Kavreplanchok

Completed 

15.0

Budol Shopping Complex

Cost Estimation and

Supervision Works

Banepa Municipality, Banepa, Kavreplanchok

Completed

16.0

Ground Water Irrigation Project, Mahottari

Hydrological data acquisition and GIS database preparation

DOI, Irrigation Division, Mahottari,

Completed 

17.0

Preparation of Master Plan of Paudi River

Detail Survey, Master Plan and Report Preparation

Water Induced Disaster Prevention SubDivision Office,

Completed 

18.0

Rehabilitation Of Ghatte Khola MHDS

Detail Feasibility Study for Rehabilitation of 

AEPC, Khumaltar

Completed

19.0

Mammal Irrigation Project, Dhading

Field & Draft Final Detail Feasibility Study and Report Preparation

Irrigation Feasibility Study & Construction Quality Program, DOI

Completed

20.0

Micro Piling for Banepa Shoping Complex

Structural Design, Drawings, Rate Analysis, Cost Estimation and Supervision

Banepa Municipality, Banepa, Kavreplanchok

Completed

21.0

Presidental College

Master plan

Presidental College, Baneshwor

Completed

22.0

Afflux analysis of West Rapti River due to Kalkaluwa bund and laxmanpur Barrage

Numerical analysis

Peoples Embankment program field office

Lamahi,Dang

Completed

23.0

Waste water quality test

Waste water quality test and preparation of report

Pokhara Sub-metropolitan

New road Pokhara