Detail Design & Feasibility
OVERVIEW
S.N | Name of The Project | Name of Client | Status |
1.0 | Upper Madi-0 Hydropower project(38 MW) | Annapurna Power Company Pvt.Ltd | Ongoing |
2.0 | Thulo Khola Hydropower Project-21.3 MW, Myagdi | Sungabha Hydropower Company Pvt. Ltd | Ongoing |
3.0 | Sagu Khola Hydroelectric Project -20 Mw, Dolakha | Himparbat Hydropower Pvt. Ltd. | Ongoing |
4.0 | Irkhuwa khola B Small hydropower project -15.52 Mw, Bhojpur | Baraha Multipower Pvt. Ltd | Ongoing |
5.0 | Upper Seti-1 Hydropower project –13 Mw, Kaski | Shrestha Energy Solution Pvt. Ltd | Ongoing |
6.0 | Sabha Khola –A Hydropower Project 10.4 Mw, Sakhuwasabhaa | Dipsabha Hydropower Pvt. Ltd Koteshwor -35, KTM | Completed |
7.0 | Garchayang Khola Hydropower Project (6.6 MW),Kaski | Citizen Hydropower Company Pvt. Ltd Dhobighat Lalitpur | Completed |
8.0 | Super Chepe Khola Hydropower Project (9.05 Mw) | Ridge Line Energy Pvt.Ltd | completed |
9.0 | Bhim Khola Small Hydropower Project-4.96 MW, Baglung | Shikhar Power Company Pvt. Ltd | Completed |
10.0 | Lankhuwa Khola Small Hydroelectric Project 5.0 MW | Sabhapokhari Hydropower P. (Ltd) | Completed |
S.N | Name of The Project | Name of Client | Status |
1.0 | Sano Bheri-3 Hydropower Project 42 MW ,Rukhu | Country Development Company Pvt. Ltd , Balaju Industrial Area, Kathmandu | Completed |
2.0 | Super Chepe Khola Hydropower Project (9.05 Mw) | Ridge Line Energy Pvt.Ltd | Completed |
3.0 | Upper Mudi Khola Hydropower Project(12.7 Mw) | Fresh Water Energy Ltd | Completed |
4.0 | Upper Daraudi-B Small Hydropower Project 8.0 MW ,Gorkha | Kalika Construction (Pvt) Ltd Kalika Tower, Baluwatar,KTM | Completed |
5.0 | Upper Seti-1 Hydropower project –13 MW, Kaski | Shrestha Energy Solution Pvt.Ltd | Completed |
6.0 | Thulo Khola Hydropower Project-21.3 MW, Myagdi | Sungabha Hydropower Company Pvt. Ltd | Completed |
7.0 | Bhim Khola Small Hydropower Project-4.96 MW, Baglung | Shikhar Power Company Pvt. Ltd | Completed |
8.0 | Kintang Khola Hydropower Project -4.0 MW, Dhading | Vision hydro pvt.ltd Kathmandu | Completed |
9.0 | Super Mai-A Hydropower Project-9.6 MW, Ilam | Sagarmatha Hydropower Company Pvt. Ltd | Completed |
10.0 | Galkot Daram Khola Hydroelectric Project -5.0 MW,Baglung | Galkot Daram Khola Hydropower Pvt. Ltd. | Completed |
S.N | Name of The Project | Type of Work | Name of Client | Status |
1.0 | Due –Diligence Study Report of Nilgiri Khola II cascade Hydropower Power Project 62.0MW, Myagdi | Review of survey report, Hydrology, Geology ,Detail Design ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal Prime Commercial Bank And Its Consortium) | Nilgiri khola Hydropower Power Company Ltd, Kamaladi | completed |
2.0 | Due –Diligence Study Report of Nilgiri -1 Hydropower Power Project 38.0MW, Myagdi | Review of survey report, Hydrology, Geology ,Detail Design ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal Prime Commercial Bank And Its Consortium) | Nilgiri khola Hydropower Power Company Ltd, Kamaladi | completed |
3.0 | Due –Diligence Study Report of Balephi-A Hydropower Project 10.6 MW, Sindhupalchok | Review of Survey report, Hydrology, Geology ,Detail Design ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal Bangladesh Bank And Its Consortium) | Moonlight Hydropower Project Pvt. Ltd, Bijulibazar | Completed |
4.0 | Technical –Diligence Study Report of Tadi khola Small Hydropower Power Project 5.0MW, Nawakot | Review of survey report, Hydrology, Geology ,Detail Design ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal Investment Bank And Its Consortium) | Hiraratna Hydropower Power Pvt.Ltd, Shamakhushi | Completed |
5.0 | Due –Diligence Study Lower Midim Khola Hydropower Project-1.0 MW Lamjung | Review of Survey report, Hydrology, Geology ,Detail Design ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Machhapuchhre Bank Limited) | Lower Midim Khola Hydropower Company Pvt.Ltd, Kathmandu | Completed |
6.0 | Supplementary Due –Diligence Study Report of Bagmati Small Hydropower project- (Capacity Upgrading from 20MW to 22 MW) , Lalitpur | Review of Hydrology, Geology ,Detail Design ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal Prime Commercial Bank And Its Consortium) | Mandu Hydropower Company Pvt.Ltd, Kamladi, Kathmandu | Completed |
7.0 | Supplementary Due –Diligence Study Report of Lower Modi Khola Hydroelectric Project (20 MW), Parbat | Consultancy services for Assessment of cost overrun of Lower Modi Khola Hydroelectric Project (20 MW) on behalf of (Nepal investment Bank and its Consortium) | Modi Energy (P.) Ltd. | Completed |
8.0 | Supplementary Due –Diligence Study Report of Madkyu Khola Hydropower Project 13MW, Kaski | Review of Survey report, Hydrology, Geology ,Detail Design ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal Bank Limited And Its Consortium) | Sikles Hydropower Pvt. Ltd, Pokhara | Completed |
9.0 | Supplementary Due –Diligence Study Report of Chake khola Hydropower Project 3MW, Ramechhap | Review of Cost Estimation & Financial Analysis Report Prepared On Behalf Of (Nepal Bank Limited And Its Consortium) | Garjhang Hydropower Pvt. Ltd, Bijulibazar | Completed |
10.0 | Bagmati Small Hydropower project- 22 Mw, Lalitpur | Bill verification of Civil , E/M, H/M and Transmission line works On Behalf Of (Prime Commercial Bank Limited and its consortium) | Mandu Hydropower Company Pvt.Ltd, Kamladi, Kathmandu | Completed |
11.0 | Upper Hewa Khola Hydropower Project -8.5 MW, Sankhuwasabha | Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation On Behalf Of (NMB Bank Limited and its consortium)) | Upper Hewa Khola hydropower company Pvt. Ltd. | Ongoing |
12 | Suri Khola Hydroelectric Project (7.0MW), Dolakha | Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation On Behalf Of (Prabhu Bank Limited) | Suri Khola Hydropower Ltd | Ongoing |
13 | Kalanga Gad Hydroelectric Project” (15.33 MW), Bajhang | Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation On Behalf Of (NMB Bank Limited) | Kalanga Hydro P. Ltd. (KHPL) | Ongoing |
14.0 | Chauri Khola Hydropower Project (6 MW) | Bill verification of Civil , E/M, H/M and Transmission line works On Behalf Of (Machhapuchhre Bank Limited and its consortim) | Chauri Hydropower Company (P) .Ltd, Anamnagar-32, Kathmandu | On going |
15.0 | Jeuli Gad Small Hydropower Project-966.0 KW, Doti | Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation On Behalf Of (Machhapuchhre Bank Limited) | Rangun Khola Hydropower Pvt.Ltd, Kathmandu | On going |
16.0 | Upper Khorunga khola Small Hydropower Project (7.5 MW) | Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation On Behalf Of (Machhapuchhre Bank Limited) | Terhathum Power Company ( P) Ltd. | On going |
S.N | Name of The Project | Type of Work | Name of Client | Status |
1.0 | Hydrological Study of the Bhotekoshi River | Inception, Field Draft, and Final Report of Hydrological Study of Bhotekoshi River | Department of Water Induced Disaster Prevention, Pulchowk | Completed |
2.0 | Mapping Of Micro Hydropower(MMHP And Preparation Of District Electrification Master Plan (DEMP) | Mapping of Micro hydropower project | AEPC, Khumaltar | Completed |
3.0 | Chitwan national park Building | Structural design, Drawing and preparation of report | Chitwan national Park Kasar, Chitwant | Completed |
4.0 | School of Science & Technology Building, Mid-Western University Surkhet | Structural Reports & Construction Recommendation for the Building | Mid-Western University, Surkhet | Completed |
5.0 | Bajura Water Supply & Sanitation Project | Feasibility Study, Detail Survey & Design (2 Projects) | WSSSDO-Bajura, Martadi | Completed |
6.0 | Rakam Irrigation Project, Surkhet | Feasibility Study, Detail Survey & Design | Mid-Western Irrigation Development Division-3, Surkhet | Completed |
7.0 | Seti River Training Works, Seti River, Doti | Desk Study, Hydrological Study, Section Details, Detail Design and Report Preparation of Seti River | Water Induced Disaster Prevention S.D. No.-5, Doti | Completed |
8.0 | Bajura Water Supply & Sanitation Project | Feasibility Study, Detail Survey & Design (2 Projects) | WSSSDO-Bajura, Martadi | Completed |
9.0 | Design of Elevated Water Tank at Butwal Municpality, Butwal | Final Report on Structural Design, Drawings, Estimate and BOQ of Elevated Water Tank | LUMANTI Support Group for Shelter, Tahachal, Kathmandu | Completed |
10.0 | Jalad River Control Works, Dhanusha | Final Report of Assessment of human dimension of People’s Embankment Programme in a Community | DWIDP, Pulchowk, Lalitpur | Completed |
11.0 | River Training Works of Seti River from Girihauka to Tikhatar | Preparation of Master Plan | Water Induced Disaster Prevention Sub-Division, Doti | Completed |
12.0 | Trisuli Trial Bridge, Trisuli Khola, Nuwakot: Type : D Span : 216.0 m | Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study, Detail Design, Drawing, Rate Analysis, Cost Estimate and BOQ | MoFALD, DoLIDAR, Suspension Bridge Division | Completed |
13.0 | Sindure Trial Bridge, Sindure, Nuwakot Type : N Span : 227.8 m | Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study, Detail Design, Drawing, Rate Analysis, Cost Estimate and BOQ | MoFALD, DoLIDAR, Suspension Bridge Division | Completed |
14.0 | Punyamati Khola RCC Bridge, Banepa Municipality, Kavreplanchok District Span : 45m | Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study, Detail Design, Drawings, Rate Analysis, Cost Estimate and BOQ | Banepa Municipality, Banepa, Kavreplanchok | Completed |
15.0 | Budol Shopping Complex | Cost Estimation and Supervision Works | Banepa Municipality, Banepa, Kavreplanchok | Completed |
16.0 | Ground Water Irrigation Project, Mahottari | Hydrological data acquisition and GIS database preparation | DOI, Irrigation Division, Mahottari, | Completed |
17.0 | Preparation of Master Plan of Paudi River | Detail Survey, Master Plan and Report Preparation | Water Induced Disaster Prevention SubDivision Office, | Completed |
18.0 | Rehabilitation Of Ghatte Khola MHDS | Detail Feasibility Study for Rehabilitation of | AEPC, Khumaltar | Completed |
19.0 | Mammal Irrigation Project, Dhading | Field & Draft Final Detail Feasibility Study and Report Preparation | Irrigation Feasibility Study & Construction Quality Program, DOI | Completed |
20.0 | Micro Piling for Banepa Shoping Complex | Structural Design, Drawings, Rate Analysis, Cost Estimation and Supervision | Banepa Municipality, Banepa, Kavreplanchok | Completed |
21.0 | Presidental College | Master plan | Presidental College, Baneshwor | Completed |
22.0 | Afflux analysis of West Rapti River due to Kalkaluwa bund and laxmanpur Barrage | Numerical analysis | Peoples Embankment program field office Lamahi,Dang | Completed |
23.0 | Waste water quality test | Waste water quality test and preparation of report | Pokhara Sub-metropolitan New road Pokhara | Completed |