S.NName of The ProjectName of ClientStatus
1.0Upper Madi-0 Hydropower project(38 MW)Annapurna Power Company Pvt.LtdOngoing
2.0Thulo Khola Hydropower Project-21.3 MW, MyagdiSungabha Hydropower Company Pvt. LtdOngoing
3.0Sagu Khola Hydroelectric Project -20 Mw, DolakhaHimparbat Hydropower Pvt. Ltd.Ongoing
4.0Irkhuwa khola B Small hydropower project -15.52 Mw, BhojpurBaraha Multipower Pvt. LtdOngoing
5.0Upper Seti-1 Hydropower project –13 Mw, KaskiShrestha Energy Solution Pvt. LtdOngoing
1.0 Upper Hewa Khola Hydropower Project -8.5 MW, Sankhuwasabha Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation  On Behalf Of (NMB Bank Limited and its consortium)) Upper Hewa Khola hydropower company Pvt. Ltd. Ongoing
2.0 Suri Khola Hydroelectric Project (7.0MW), Dolakha Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation  On Behalf Of (Prabhu Bank Limited) Suri  Khola Hydropower Ltd Ongoing
3.0 Kalanga Gad Hydroelectric Project” (15.33 MW), Bajhang Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation  On Behalf Of (NMB Bank Limited) Kalanga Hydro P. Ltd. (KHPL) Ongoing
4.0 Chauri Khola Hydropower Project (6 MW) Bill verification of Civil , E/M, H/M and Transmission line works On Behalf Of (Machhapuchhre Bank Limited and its consortim) Chauri Hydropower Company (P) .Ltd, Anamnagar-32, Kathmandu On going
5.0 Jeuli Gad Small Hydropower Project-966.0 KW, Doti Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation  On Behalf Of (Machhapuchhre Bank Limited) Rangun Khola Hydropower  Pvt.Ltd, Kathmandu On going
6.0 Upper Khorunga khola Small Hydropower Project (7.5 MW) Bill verification of Civil , E/M, H/M and Transmission line works and progress report preparation  On Behalf Of (Machhapuchhre Bank Limited) Terhathum Power Company ( P) Ltd. On going
7.0 Supplementary Due –Diligence Study Report of Balephi-A Hydropower project- (Capacity Upgrading from 10.6 MW to 22 MW) , Sidhupalchowk Review of survey report, Hydrology, Geology ,Detail Design ,Drawings, Cost Estimation & Financial Analysis Report Prepared On Behalf Of ( Nepal Bangladesh And Its Consortium) Moonlight Hydropower Project Pvt. Ltd, Bijulibazar On going

S.N

Name of The Project

Type of Work

Name of Client

Status

1.0

Upper Solu khola HHP(19.8 Mw)

Detail design and Preparation of construction drawing

Beni Hydropower Project  Pvt.Ltd

Detail design completed, Construction  Ongoing

2.0

Thulo Khola Hydropower Project-21.3 MW, Myagdi

Detail Design, Preparation of Construction Drawings

Sungabha Hydropower Company Pvt. Ltd

Detail design completed, Construction supervision  Ongoing

3.0

Khani Khola Hydroelectric Project (30MW),Dholakh

Construction Supervision and Redesign of Project Component if needed

Sasha Engineering Hydropower Pvt. Ltd.

 

Construction supervision Ongoing

4.0

Daram Khola Hydroelectric Project 9.6 MW, Baglung

Detail Design, preparation of tender documents and  Preparation of Construction Drawings

Daram khola Hydro energy Co.ltd Thapathali , Ktm

Detail design completed, Construction supervision  Ongoing

5.0

Super Chepe Khola

Hydropower Project- 9.05 Mw, Gorkha

 

Detail Design, preparation of tender documents and  Preparation of Construction Drawings

 

Ridgeline energy   Pvt.Ltd

Detail design completed, Construction supervision  Ongoing

6.0

Upper Machha khola Hydropower Project 4.55 Mw, Gorkha

Detail Design, preparation of tender documents and  Preparation of Construction Drawings

Bikash Hydropower   Company Pvt.Ltd

Detail design completed, Construction supervision  Ongoing

7.0

Mid- Solu khola Hydropower Project -9.5 MW, Solukhumbu

Destail design and Preparation of construction drawing

Mid-Solu Hydropower  Project Pvt .Ltd

Detail design completed, Construction ongoing

 

8.0

Upper Lohore small Hydropower Project 4.0 Mw, Dailekha

Detail Design, preparation of tender documents and  Preparation of Construction Drawings

Upper Lohore Small Hydropower Project Co. Pvt.Ltd

Detail design completed, Construction  Ongoing

9.0

Bhim Khola Small Hydropower Project-4.96 MW, Baglung

Detail Design, preparation of tender documents and  Preparation of Construction Drawings

Shikhar Power Company Pvt. Ltd

Detail design completed, Construction  Ongoing

10.0

Buku Kapti Hydropower Project 5.0 Mw, Okhaldhunga

Detail Design, preparation of tender documents and  Preparation of Construction Drawings

Himstar Uraja Company Ltd